Community & Public Projects
A selection of our work with councils, sporting clubs and community organisations. Client names are withheld; we're happy to discuss any of these projects in more detail.
Riverside Activity Hub, Brisbane
Concept masterplan, 2026
A shared riverside base for five groups: canoeing, rowing, sailing, Scouts and yoga. We mapped how each group actually uses the site (launch times, boat movements, storage and wash-down) and turned that into a staged masterplan. Canoe storage, parking and pavilion seating come first, and the larger shared building follows. The site went under 9.2 m of water in 2011 and 7.8 m in 2022, so the buildings are elevated, naturally ventilated and built from materials that can be hosed down and reused.
Football Club Precinct, South East Queensland
Masterplan and Stage 1 concept, 2025–26
A masterplan for a growing club on a large shared reserve. It fixes where courts, parking and a new clubhouse go, so that each stage builds towards the same end point. Stage 1 is a two-storey clubhouse with change rooms, a canteen and storage.
Community Support Centre, Scenic Rim
Stage One, 2025–26
A former house and the building next door, converted into a community support centre. The work involved a change of use, full accessibility upgrades (ramps, an accessible WC and wider corridors) and new landscaping with a landscape architect. We coordinated the engineers and certifier through to construction. It's planned as the first stage of a longer-term site plan.
Heritage Croquet Club, Inner Brisbane
Flood resilience works, 2026
Resilience works that lift the club's vulnerable parts above a target level beyond the 1-in-200-year river flood. This was done under a heritage exemption, so the club keeps its character. Issued for construction October 2026.
Sporting Club Flood Recovery, Brisbane
Flood resilience program
Part of our work on 50+ community facilities. Ex-Tropical Cyclone Alfred re-flooded this grandstand in March 2025, so we reassessed the site, documented raising the hot water units, pumps and switchboards above the target level, tendered the works and certified completion.
→ Learn more about our Masterplanning work